What Actually Happens on Solar Installation Day?

A lot of people put off calling about solar simply because the process feels like a mystery — how long does it take, what do you need to prepare, will your house be in chaos for a week? Here’s exactly what to expect, from the first phone call to the day your system switches on.

Step 1: The first conversation

You call, WhatsApp, or fill in a form. We ask a few basic questions — roughly what you’re hoping to achieve (lower bill, blackout backup, full independence), your current KPLC bill if you have it handy, and your location. This takes a few minutes and costs nothing. No commitment at this stage.

Step 2: The free site assessment

We visit your home or business at a time that works for you. This is the part that actually determines your system size — we look at your roof (type, orientation, any shading from trees or buildings), check your DB board and existing wiring, and go through your appliances and usage patterns with you. We’ll ask about your last few KPLC bills if you have them, since actual billing history tells us more than a guess ever could.

This usually takes 30–60 minutes, depending on the property.

Ready to book your free site assessment? Call or WhatsApp us on +254 741 163020, or fill in the form on our contact page — we’ll schedule a visit at a time that suits you.

Step 3: The quotation

Within a few days of the site visit, you’ll get a full, itemised quote — panels, inverter, battery, mounting, cabling, and labour listed separately, with the system size and expected output clearly explained. This is also when we talk through payment options if you’re not paying the full amount upfront (see our separate guide on solar financing in Kenya).

Take your time with this step. A good quote is worth reading properly, and we’re happy to answer questions before you commit to anything.

Step 4: Scheduling and preparation

Once you confirm, we schedule the installation date and order any equipment that isn’t already in stock. We’ll let you know roughly what to expect on the day — whether you need to clear access to the roof, move anything near the planned inverter location, or arrange anything else in advance. Most of the time, preparation on your end is minimal.

Got questions about what you specifically need to prepare before our team arrives? WhatsApp us on +254 741 163020 and we’ll walk you through it.

Step 5: Installation day

For a typical home system, installation takes one to three days, depending on system size and roof complexity. Here’s the general order of work:

  1. Mounting structure goes up on the roof first — the frames the panels will sit on.
  2. Panels are installed and wired on the mounting structure.
  3. The inverter and battery are installed at the agreed indoor or sheltered location.
  4. Cabling runs between panels, inverter, battery, and your DB board, following proper electrical protection standards.
  5. Testing and commissioning — the system is switched on, checked for correct operation, and monitored briefly to confirm everything’s working as designed.

Larger commercial systems or more complex roof structures can take longer — we’ll give you a realistic timeline specific to your project before work begins, not a generic estimate.

Step 6: Handover and training

Before we leave, we walk you through how to read your system’s app (SolarmanPV, Growatt, or VictronConnect, depending on your inverter), show you the basics of what to check if something seems off, and make sure you know how to reach us for support. You’ll receive your warranty documentation and any compliance paperwork at this stage too.

Already had your system installed and want a refresher on using the app, or have a question about your setup? Call +254 741 163020 — we support systems we installed long after the original handover.

Step 7: Net metering application (if applicable)

If you’re pursuing net metering, we submit the application to KPLC on your behalf at this stage, along with the required technical documentation. This part runs on KPLC’s timeline, not ours, so we’ll keep you updated rather than leave you guessing (see our separate guide on how net metering actually works).

What the whole process usually takes, start to finish

From your first call to a fully commissioned system, most residential projects take 2 to 4 weeks — a few days for the site visit and quote, a short wait for equipment if anything needs ordering, then 1–3 days on-site for installation itself. Larger or more complex commercial projects take longer, and we’ll always give you a realistic timeline specific to your project rather than a generic promise.

Ready to start?

Book your free site assessment or call +254 741 163020 — the first step costs nothing, and you’ll know your real options and pricing before deciding anything further.

  • The Alltop 200 Watts Solar Flood Light is a practical solar-powered lighting solution for homes, businesses, farms, parking areas, driveways, compounds, gardens, warehouses and other outdoor spaces that need dependable lighting after dark.

    Designed to operate using solar energy, the 200W solar flood light charges during the day and provides illumination at night without relying directly on mains electricity. This makes it a convenient option for properties where conventional electrical lighting may be expensive or difficult to install.

    For customers searching for solar flood lights in Kenya, the Alltop 200W offers a straightforward way to improve outdoor visibility while making use of renewable solar energy.

      KSh 5,500.00

      • Shipping From: KSh 1,000.00
      • Availability: In stock
    • Powerful 300W Solar Flood Light for Outdoor Security

      The Alltop 300 Watts Solar Flood Light is a practical outdoor lighting solution for homes, businesses, compounds, farms, parking areas, driveways, gardens, warehouses and other spaces that require reliable illumination without depending on mains electricity.

      Designed for solar-powered operation, this 300W solar flood light uses sunlight during the day to charge its battery and provides lighting after dark. It is particularly useful in areas where running electrical cables is difficult, expensive or inconvenient.

      For homeowners and businesses in Kenya looking for solar security lights, the Alltop 300W provides a convenient way to improve visibility around outdoor areas while reducing dependence on grid power.

        KSh 6,500.00

        • Shipping From: KSh 1,000.00
        • Availability: In stock
      • High-Capacity Solar Charging for Demanding Applications

        The Felicity 100A MPPT Charge Controller is engineered to deliver powerful and reliable performance for large solar systems. With its 100-amp capacity, it is ideal for commercial installations, large homes, farms, and off-grid systems that require efficient and consistent battery charging.

        This controller ensures smooth energy flow from your solar panels to your battery bank, supporting high power demands while maintaining system stability and performance.


        Advanced MPPT Technology for Maximum Efficiency

        Equipped with intelligent Maximum Power Point Tracking (MPPT), the Felicity 100A controller optimizes the voltage and current from your solar panels to extract the highest possible energy output. This results in significantly improved efficiency compared to traditional controllers, especially under changing sunlight conditions.

        By maximizing solar energy harvesting, it reduces energy losses and improves overall system productivity.

          KSh 29,500.00

          • Shipping From: KSh 1,000.00
          • Availability: In stock